Our projects speak for themselves
VDOT Drainage Repair & Improvement, Int. Rte. 1 & Hudgins Rd
Emergency removal and replacement of failed metal culvert beneath US Rte 1 in Spotsylvania for VDOT. Work included traffic control, erosion, pavement, concrete and pipe demolition, installation of new 54” concrete pipe and structures and complete restoration. Work performed ahead of schedule with minimal disruption and to the high satisfaction of VDOT.
Fredericksburg PPEA Utilities
Design/build project included engineering, layout, easement acquisition, replacement of 28,000 ft of sanitary and water mains in 5 locations in the city. Rehabilitation of utilities in the City dating back to the 1940’s was done using a combination of conventional open cut, and also pipe bursting, slip lining and horizontal directional drilling.
Massaponax Interceptor Phase 2A&B
A sewer trunk line replacement for Spotsylvania County consisting of over 5 miles of 36″ pipe, 118 manholes, and all associated laterals and connections. The project also included a jack and bore beneath I-95 as well as two shorter bores. The Phase 2B portion was an emergency project and was completed well ahead of schedule.
Stafford Hospital Center Phase 2 Road
10,000 feet of four lane highway access including box culvert, storm drain system, water main, site concrete, pavement and landscaping. Also included was road widening to the existing VDOT roadway.
Stafford Hospital Center
A 38 acre site project for Medicorp Health System’s new hospital in Stafford. The job involved moving over 400,000 cubic yards of earth and fine grading for the buildings and roads. There was also over 10,000 feet of storm line, 4,000 feet of sanitary sewer and 5,000 feet of water line installed.