Our projects speak for themselves
MWH Womens Health Facility – Phase II
Total sitework including 1,800 CY site demolition, erosion control, 5,000 CY excavation, utilities, site concrete and paving 10,000 SY. Spratt completed another project for the mighty Whiting Turner Company without litigation and kept Medicorp satisfied.
UMW Dahlgren Education & Research Center
Total sitework for a new 40,000 SF academic building in King George County including of 7.5 AC clearing, erosion control, 41,145 CY rough grading w/import, 1,200’ of watermain and appurtenances, 912’ sanitary sewer, storm water management, duplex pump station, site concrete and paving.
Pender Camp Fort AP Hill
Design/Build project consisting of 1,500' of sanitary sewer, 6 manholes and appurtenances, 1,000' sanitary force main, 3,750' of 8" water, Grinder Pump Station, Two 50,000 gallon water tanks with concrete foundations and SCADA.
Repair Valves & Fire Hydrants on Mainside at Marine Corps Base
Remove and replace valves, hydrants and water transmission mains throughout the marine corps base mainside. The important project seamlessly eliminated Gordian knots from the WWII water infrastructure in Quantico.
Aquia Wastewater Pump Station
Demolition and restoration of existing pump station including 26 ft deep x 10 ft diameter wet well, valve vault, control building and replacement of gravity sewer and structures.