Projects

Ronald Reagan Washington National Airport

When one of our repeat clients reached out with an opportunity to work at the DMV’s most historic airport, we could not pass it up. This project was necessary to upgrade the existing drying beds. Along with water, sewer, and storm drain utilities it also included an extensive cast in place concrete package, new sand trap with a duplex pumping system, and concrete encased electrical conduits. We were able to complete the drying bed upgrades to the complete satisfaction of everyone involved.

<< Back