Constructed 8,000’ of asphalt trail from the former VEPCO canal down Caroline St to and along Riverside Dr and Fall Hill Avenue on the river. The job included 2 KIOSKS, signage, storm water management piping & structures, concrete curb & gutter, excavation, bridge connecting Old Mill Park and boardwalk. Runners were on the trail with gusto before the pavement marking dried!