Utility Improvements Project

Design/Build infrastructure improvement project for the City of Fredericksburg. This project consisted of installation of over 5,900 LF of new 12" Zinc Coated waterline on Caroline Street from Amelia to the streets terminus. Throughout the installation 14 new hydrants were installed and over 190 service connections were made. This project greatly improved the water pressure to the residents and businesses as well as vastly improved the fire suppression systems in the buildings. In addition to the waterline, over 1,200 LF of sanitary sewer line was either replaced or rehabbed via CIPP.