Pender Camp Water Main Extension

Major Design/Build upgrade located in Fort AP Hill included 32,000’ of 8" Water Main, a Booster Station, 2 Mixing Units and Altitude Valve for the existing water tanks, a Chlorine Injection Station, 40,000 gal Carbon Steel Fire Suppression Tank, 4 Auto Flushing Units, SCADA, Air Release Valves, Fire Hydrants and complete restoration.