Our projects speak for themselves

Fuller Heights Park
2014
Total Sitework for a 15 AC Athletic Facility with Entrance Road, Parking, Three Baseball Fields and Sod Turf. Job included Clearing, 250,000 CY Excavation, Erosion Control, 2,200’ Storm Drainage, 2,500’ Water and Sewer, Irrigation, Sod, Fencing, Stadium Lighting, Baseball Diamonds, Dugouts & Bleachers, Site Concrete, Paving, Retaining Walls and Landscaping.

Shiloh Park
2014
Construction of Soccer and Softball Fields turfed with Bermuda sprigs. Also, included an Access Road, Parking Lot, Water Well & Pump, Baseball Diamond, Dugouts, Related Utilities, 50,000 SY Grading and Miscellaneous Improvements.

Falls Run Interceptor Improvements
2014
An important trunk line sanitary sewer upgrade for Stafford County. Installation of over 13,000’ of 30” – 42” gravity sewer and 67 sanitary manholes. Roughly a third of the trenching at depths over 20’ was in rock. Project access w/ multiple creek-crossings and restoration including wetlands planting. The project also included an Odor Control Unit, 3HP Franklin Miller Taskmaster Sewer Grinder, flow meter, and other upgrades to the existing Falls Run Pump Station.

Quantico National Cemetery Administration Building
2013
Another project done by Spratt inside the Quantico National Cemetery without interruption of military services. Job included: Erosion Control, Demolition, Clearing, Rough Grading, Sanitary Septic System, Storm Sewer & Detention System, Water Main, Fine Grade, Stone Base below Asphalt and Concrete.

Stafford Hospital East Campus
2013
17 AC Total Sitework providing infrastructure for future commercial development. Project included Erosion, Clearing, 134,000 CY Excavation, 2,300’ Sanitary, 2,900' Storm, 4,400' Water 45,000 SF Site Concrete, 13,000 TN Stone Base, 4,500 TN Asphalt and Restoration.