Our projects speak for themselves
COF PPEA
Design / Build Infrastructure Improvements to Water System at College Heights and Wastewater System at Normandy Village, William St and Charles St. Project improved water flow and pressure throughout the College Heights and also positively impacted UMW’s facilities. Replaced Sanitary Sewer and service connection in Normandy Village. Revitalized the existing sanitary sewer beneath William St downtown VIA CIPP trenchless rehab and also replaced several manholes. The Charles St. work included rehab / replacement of existing 18” sanitary with new 21” pipe and manholes. All restoration done all sites.
Fuller Heights Park
Total Sitework for a 15 AC Athletic Facility with Entrance Road, Parking, Three Baseball Fields and Sod Turf. Job included Clearing, 250,000 CY Excavation, Erosion Control, 2,200’ Storm Drainage, 2,500’ Water and Sewer, Irrigation, Sod, Fencing, Stadium Lighting, Baseball Diamonds, Dugouts & Bleachers, Site Concrete, Paving, Retaining Walls and Landscaping.
Shiloh Park
Construction of Soccer and Softball Fields turfed with Bermuda sprigs. Also, included an Access Road, Parking Lot, Water Well & Pump, Baseball Diamond, Dugouts, Related Utilities, 50,000 SY Grading and Miscellaneous Improvements.
Falls Run Interceptor Improvements
An important trunk line sanitary sewer upgrade for Stafford County. Installation of over 13,000’ of 30” – 42” gravity sewer and 67 sanitary manholes. Roughly a third of the trenching at depths over 20’ was in rock. Project access w/ multiple creek-crossings and restoration including wetlands planting. The project also included an Odor Control Unit, 3HP Franklin Miller Taskmaster Sewer Grinder, flow meter, and other upgrades to the existing Falls Run Pump Station.
Quantico National Cemetery Administration Building
Another project done by Spratt inside the Quantico National Cemetery without interruption of military services. Job included: Erosion Control, Demolition, Clearing, Rough Grading, Sanitary Septic System, Storm Sewer & Detention System, Water Main, Fine Grade, Stone Base below Asphalt and Concrete.